Functional Requirements

Given the fluid nature of technology projects, the requirements as noted on this site may change over time.  This baseline information is provided as a reference and starting point for further discussion, research and project development activities.  Contact the project sponsor for confirmation of the currency of the material provided here.

examples of current bay area projects

Bay Area ITS Project Project Sponsor/Contact Requirements/Notes
511 Parking Alysha Nachtigall Functional Requirements are not available at this time.
511 Real Time Transit Jim Macrae This document presents the system requirements for the Bay Area Regional Real-Time Transit Information System.  These requirements are based on the evaluation criteria developed for the selection of the architecture, discussions with the MTC, the TAC and Telvent Farradyne (TF), and on the existing procedures and features of the existing real-time system.  Download PDF
511 Regional Transit Information System Thomas Spiekerman This document details the data interfaces for transmitting static transit data. Download PDF
511 Traffic Jim Macrae This document describes the interfaces used to disseminate the 511 traffic data feed. Download PDF
Bay Area Center-to-Center (C2C) network Joy Lee This report presents a description of the existing legacy systems that will participate in the Interim Center-to-Center (C2C) System; identifies the functions that are desired by each participating system; and presents a Scope of Work for developing the Interim C2C System. Download PDF
Bay Area FasTrak® Program Beth Zelinski   FasTrak® transponders are required to be compatible with the Title 21 specification for transponder interoperability. View the Title 21 compatibility specifications. Download PDF
Call Boxes/Freeway Service Patrol Joanna Fox Functional Requirements are not available at this time.
Clipper® Lynn Valdivia The participation of numerous agencies with various fare structures and rules require close coordination to operate and maintain Clipper. For more information, view the Clipper Operating Rules. Download PDF
East Bay SMART Corridors Program John Hemiup This document describes the project requirements for the East Bay SMART Corridors.
Download PDF
Emergency Management Radiah Victor The Regional Transportation Emergency Management Plan describes the roles and responsibilities of Bay Area agencies in coordinating information sharing functions. Download PDF
Express Lanes Lisa Klein The Concept of Operations including a functional overview of the I-680 Smart Lane is provided here for reference. Download PDF
Freeway Performance Initiative Joy Lee
Danielle Stanislaus

The FPI program is supported by several regional ITS projects. Refer to the links to the requirements for the I-80 ICM, East Bay SMART Corridors, Bay Area Center-to-Center (C2C) network, and 511 Traffic projects listed in this matrix.

I-80 Integrated Corridor Mobility (ICM) Raj Murthy This RFP for Software  Development and System Integration Services includes the functional requirements for the project. Download PDF
Incident Management Radiah Victor Incident management is supported by several regional ITS projects. Refer to the links to the Bay Area Center-to-Center (C2C) network,  Call Boxes/Freeway Service Patrol, I-80 ICM and East Bay SMART Corridors projects listed in this matrix.
San Mateo Smart Corridors Sandy Wong This document includes the high level requirements and the  detailed design requirements for the ITS subsystems. Download PDF
SFpark Jay Primus Information is available for the API to distribute parking availability data from the SFpark data warehouse. Download PDF