| Bay Area ITS Project |
Project Sponsor/Contact |
Requirements/Notes |
| 511 Parking |
Alysha
Nachtigall |
Functional Requirements
are not available at this time. |
| 511
Real Time Transit |
Jim Macrae |
This document presents the system requirements
for the Bay Area Regional Real-Time Transit Information System.
These requirements are based on the evaluation criteria developed for
the selection of the architecture, discussions with the MTC, the TAC
and Telvent Farradyne (TF), and on the existing procedures and features
of the existing real-time system.
Download PDF |
| 511 Regional Transit
Information System |
Thomas Spiekerman |
This document details the data interfaces for transmitting static
transit data.
Download PDF |
| 511
Traffic |
Jim Macrae |
This document describes the interfaces used to disseminate the 511
traffic data feed. Download PDF |
| Bay Area
Center-to-Center (C2C) network |
Joy
Lee |
This report presents a description of the
existing legacy systems that will participate in the Interim
Center-to-Center (C2C) System; identifies the functions that are
desired by each participating system; and presents a Scope of Work for
developing the Interim C2C System. Download
PDF |
|
Bay Area FasTrak® Program |
Beth
Zelinski |
FasTrak® transponders are
required to be compatible with the Title 21 specification for
transponder interoperability. View the Title 21 compatibility
specifications. Download
PDF |
| Call Boxes/Freeway
Service Patrol |
Joanna
Fox |
Functional Requirements
are not available at this time. |
|
Clipper® |
Lynn
Valdivia |
The participation of
numerous agencies with various fare structures and rules require close
coordination to operate and maintain Clipper. For more information,
view the Clipper Operating Rules.
Download
PDF |
| East Bay SMART Corridors
Program |
John
Hemiup |
This document describes
the project requirements for the East Bay SMART Corridors.
Download
PDF |
|
Emergency Management |
Radiah Victor |
The
Regional Transportation Emergency Management Plan describes the roles
and responsibilities of Bay Area agencies in coordinating information
sharing functions. Download
PDF |
| Express Lanes |
Lisa
Klein |
The Concept of Operations including a functional
overview of the I-680 Smart Lane is provided here for reference.
Download PDF |
|
Freeway Performance Initiative |
Joy
Lee
Danielle
Stanislaus |
The FPI program is supported
by several regional ITS projects. Refer to the links to the
requirements for the I-80 ICM, East Bay SMART Corridors, Bay
Area Center-to-Center (C2C) network, and 511 Traffic projects
listed in this matrix.
|
| I-80 Integrated Corridor
Mobility (ICM) |
Raj
Murthy |
This RFP for
Software Development and System Integration Services includes the
functional requirements for the project.
Download
PDF |
| Incident Management |
Radiah
Victor |
Incident management is
supported by several regional ITS projects. Refer to the links to
the Bay Area Center-to-Center (C2C) network,
Call Boxes/Freeway Service Patrol, I-80 ICM and East Bay SMART
Corridors projects listed in this matrix. |
| San Mateo Smart Corridors |
Sandy Wong |
This document includes
the high level requirements and the detailed design requirements
for the ITS subsystems. Download
PDF |
| SFpark |
Jay Primus |
Information is available for the API to distribute parking availability
data from the SFpark data warehouse. Download
PDF |