Projects (By Sponsor)

Projects are organized in the table below by project sponsor. The project status is listed as one of the following categories:

  • Existing: in place and operating.
  • Ongoing: partly implemented with imminent or ongoing expansion, upgrades, or development.
  • Future: proposed projects that may or may not be programmed.
  • N/A: projects that are not reflected in market package diagrams specifically. Primarily these projects are ITS in nature, but do not involve data exchange with other systems.

The ITS Service Diagram for each project is a high-level illustration of the data flows between different systems and equipment packages that provide a desired service such as transit signal priority, traveler information or electronic toll collection.

Updated 12/28/11

Stakeholder Category Project Name Project Description Project Status ITS Service Diagram

AC Transit

Transit Information Real-Time Passenger Seat Availability Information System that identifies real-time vehicle occupancy Future APTS10-1
Transit Management Automatic Passenger Counters (APC) Passenger counting system on part of fleet. Existing APTS10-1
Transit Information Fleetwide Automatic Vehicle Location (AVL) Systems Transit vehicle automatic location system Existing APTS01-1
Transit Management Automatic Passenger Counter (APC) Upgrade/Expansion Upgrade and expand automatic passenger counting system to full fleet. Ongoing APTS10-1
Transit Management Automated Bus Routing Automated bus routing system to accommodate real time demand Future APTS03-1
APTS02-01
Transit Management Integrated Central Dispatch and Emergency Operations Facility functions as an EOC during emergencies. Agencies would include any agencies that would utilize the EOC during emergencies. Future EM09-1
APTS02-01
Transit Information Real-time Bus Arrival Information Real time bus arrival time information Existing APTS08-02
APTS08-01
Transit Information Voice Annunciator/ Light Emitting Diode (LED) Signs Transit vehicle information annunciation and signing system Ongoing APTS08-02
APTS08-01
Transit Vehicle Priority Bus Signal Priority Allow transit vehicles higher priority at intersections Ongoing APTS09-01
Transit Management Mobile Command Bus Transit vehicle communication and control system Future APTS05-01
Transit Management Enhanced Operations and Data Analysis Analyzing transit management data for better performance Future AD1-4
Transit Management Transit Planning Document Archival and Data Warehouse Transit operation data archive Future AD1-4
Transit Management Transit Signal Priority (TSP) Feedback Capability Transit Communication Existing APTS09-01
On-Vehicle Safety System Collision Avoidance and Automated Docking Systems Vehicle on-board safety system Future APTS09-01
Transit Security Alternate Emergency Computer Center for Operational Continuity Transit emergency management Future N/A
Transit Management Geospatial Information Systems Enhancement Transit Management with GIS Future N/A
ITS Integration Interagency Communications Upgrade and Rebuild Mesh network, enhanced capability, etc. Future N/A
Transit Management Electronic Fare Collection System Electronic fare collection using the Clipper® card Existing High-Level Diagram

APTS04-01

Alameda CTC

ITS Integration Closed Circuit Television (CCTV) Camera Integration CCTV camera image/data integration Ongoing ATMS03-01
Toll Management I-580 Demonstration Express Lane HOV-Toll lane Ongoing High-Level Diagram

ATMS10-3
ITS Integration I-580 and I-238 Intelligent Transportation System (ITS) ITS integration between multiple corridors Future ATMS08-05
ATMS07-04
ITS Integration East Bay SMART Corridor Advanced Transportation Management System (ATMS) ATMS Existing High-Level Diagram

ATMS03-03
ATMS01-03
Arterial Traffic Management Transportation Management Center Arterial traffic management coordination Existing ATMS07-03
Arterial Traffic Management; Freeway Traffic Management I-80 Integrated Corridor Management Integrated freeway and arterial coordination that will include CCTV cameras, Information Display Boards, variable advisory speed signs, ramp metering, trailblazers, vehicle detection, and alternative mode coordination Ongoing High-Level Diagram

ATMS07-11

Antioch

Freeway Traffic Management Highway 4 Corridors Traffic Management Plan Freeway traffic management coordination Ongoing ATMS08-10
ATMS07-09
ATMS06-09

BART

Transit Management Station Database/E-BART Bart extension to East Contra Costa County with associated transit management Existing AD1-4
Transit Management Radio Communications Transit vehicle radio communication Existing APTS02-02
Transit Management EZ Rider Smart Card Parking Payment System Ongoing ATMS16-6
Transit Management Fare Collection System Transit fare collection system Existing High-Level Diagram

APTS04-02
Arterial Traffic Management Closed Circuit Television (CCTV) Deployment Transit system CCTV camera deployment Existing APTS05-02
ITS Integration Real-Time Information System Transit system real time information Existing APTS08-03
Transit Management Train Arrival Signs and Annunciator System Transit vehicle arrival sign and annunciation system for the travelers Existing APTS08-03
Transit Information Trip Planning Transit trip planning and connection information Existing APTS08-03
Transit Information Website (www.bart.gov) Dynamic Transit Information Transit information website Existing APTS08-03

Benicia

Transit AVL/CAD Automatic Vehicle Locator Monitoring bus locations for dispatch purposes Future APTS01-6
Transit Management Scheduling Software Scheduling paratransit trips throughout service area Future APTS03-5
Traveler Information Destination Signs Public Information Existing APTS08-11
Transit Security Security Cameras and Control Station Enhance security on board buses Future APTS05-08
Transit Management Radios Improve communications between buses Future APTS02-11
Transit Management Fareboxes, Probe, and Computer Program Improve the reliability of data from fareboxes Future APTS04-12

Caltrain

Transit Management Automatic Passenger Counters (APC) Automatic passenger counting system Future APTS10-5
Transit AVL/CAD Automatic Vehicle Location (AVL) Automatic vehicle location system Ongoing APTS01-2
Transit Information Real-Time Information Collection and Dissemination Transit real time information collection and dissemination system Ongoing APTS08-04
APTS02-03
APTS01-2
Transit Information Train Arrival Signs and Annunciator System Transit vehicle arrival information Existing APTS08-04
Transit Management Caltrain Transit Asset Management System (CTAMS) This project will further the development of the Caltrain Transit Asset Management System (CTAMS) with activities that may include, but not be limited to: 1) Integration of CTAMS into a relational database, 2) continuation of the build-out of the fixed rail asset infrastructure modules within the system, and 3) inclusion of a manual for users that will serve as a guide on how to use CTAMS. Future AD1-10
Transit Management Electronic Fare Collection System Electronic fare collection using the Clipper® card Existing High-Level Diagram

APTS04-04
Transit Management Positive Train Control Implement a positive train control system with an on-board display and automated braking to enhance safety for Caltrain. Ongoing APTS01-8

Caltrans

Transit Management Bay Area Video Upgrade Transit vehicles/infrastructure surveillance system upgrade Future APTS08-04
Transit Management El Camino Real Signal Interconnect With San Mateo C/CAG. Ongoing ATMS03-02
Freeway Traffic Management I-80 Integrated Corridor Mobility (ICM) Integrated freeway and arterial coordination that will include CCTV cameras, Information Display Boards, variable advisory speed signs, ramp metering, trailblazers, vehicle detection, and alternative mode coordination Ongoing High-Level Diagram

ATMS04-1
Freeway Traffic Management Traffic Operations System (TOS) and Traffic Management Center (TMC) Traffic management center Existing ATMS04-1
Freeway Traffic Management I-680 Smart Carpool Lane HOV-Toll lane management system Existing High-Level Diagram

ATMS10-4
Freeway Traffic Management Caltrans Highway Information Network (CHIN) Telephone traveler information system Existing ATIS01-02
ATIS01-01
Freeway Traffic Management I-880 Corridor Traffic Operations System Elements and Ramp Metering Highway ramp metering control Existing ATMS04-1
Freeway Traffic Management Pre-Pass Project Statewide effort on Cal Statewide ITS Architecture Future CVO03-1
Freeway Traffic Management I-680 Corridor Traffic Operations System Elements and Ramp Metering Highway ramp metering control Future ATMS04-1
Freeway Traffic Management SR 237 Corridor Traffic Operations System Elements and Ramp Metering Highway ramp metering control Future ATMS04-1
Freeway Traffic Management SR 85 Corridor Traffic Operations System Elements and Metering Highway ramp metering control Existing ATMS04-1
Freeway Traffic Management US 101 Corridor Traffic Operations System Elements and Metering Highway ramp metering control Existing ATMS04-1
Freeway Traffic Management Traffic Operations System Field Element Installation: SR 237 and I-880 ITS field devices deployment Future ATMS04-1
Traveler Information GGNRA - Traveler Information System Provide traveler information for the Golden Gate National Recreation Area (GGNRA) through the 511 system. 511 users will be able to obtain congestion information on US 101 and Highway 1, as well as real-time transit information for transit service operated by Marin Transit and real-time parking availability. Future High-Level Diagram

High-Level Diagram

ATIS01-03
ATIS01-02
ATIS01-01
Parking Management GGNRA - Parking Guidance System A parking guidance system (PGS) will provide real time parking information for visitors at the Golden Gate National Recreation Area (GGNRA). Information from the PGS will be disseminated through 511, variable message signs and highway advisory radio. Future High-Level Diagram

ATMS16-5

Campbell

Arterial Traffic Management Hamilton Avenue Intelligent Transportation System (ITS) Expand on the ITS infrastructure currently on Hamilton Ave. by linking three signals via wireless interconnect to the Smart Corridor signals to the east. Will include signal retiming of these three signals. Existing ATMS03-10
Arterial Traffic Management Winchester Blvd Intelligent Transportation System (ITS) Expand upon existing ITS equipment on Winchester Blvd. by installing new conduit, fiber, and fiber equipment. Future ATMS03-10
Arterial Traffic Management Reactivation of Existing Traffic Count Stations Reactivating traffic count stations along arterials such as Hamilton Ave., Winchester Blvd. and Campbell Ave. Future ATMS19-1
AD1-8
Arterial Traffic Management Traffic Signal System Upgrade Replace older traffic signal controllers with new controllers and signal system software that is compatible with NTCIP and Silicon Valley-ITS Data Exchange Network Software protocols Future ATMS03-10
Arterial Traffic Management Installation of Pedestrian Countdown Timers ITS field devices deployment Future ATMS03-10

Central Contra Costa Transit Authority

Transit Management Automatic Vehicle Location (AVL) Vehicle Probe Automatic vehicle location system Existing APTS01-6
Transit Information Real Time Passenger Information Web based real time passenger information system - BusTime Future APTS08-14

CHP

Arterial Traffic Management Computer-Assisted Dispatch (CAD) Upgrade Computer assisted dispatching system for emergency response Existing High-Level Diagram

EM01-1

Concord

Arterial Traffic Management Concord-Walnut Creek and Pleasant Hill Smart Corridor along I-680 Integrated arterial and freeway management system Future ATMS06-11
ATMS06-10
ATMS03-10
ATMS01-10
Arterial Traffic Management Concord Closed Circuit Television (CCTV) ITS field devices deployment Existing ATMS01-10
Arterial Traffic Management Concord Signal System Upgrade and Traffic Management Center (TMC) Signal upgrade Existing ATMS03-10
Arterial Traffic Management Concord Kirker Pass Road/Ygnacio Valley Road Arterial Management Plan Integrated arterial management system Existing ATMS03-10

Contra Costa Transportation Authority

Arterial Traffic Management; Freeway Traffic Management I-80 Integrated Corridor Management Integrated freeway and arterial coordination that will include CCTV cameras, Information Display Boards, variable advisory speed signs, ramp metering, trailblazers, vehicle detection, and alternative mode coordination Ongoing High-Level Diagram

ATMS07-11
Traveler Information Real-Time Ridematching SR 4 Traffic Management Program 3-County Real-Time Ridematching Future ATIS08-1

County of Santa Clara

Arterial Traffic Management Intelligent Transportation System (ITS) Enhancements on Bascom Ave ITS field devices deployment Existing ATMS01-10
Arterial Traffic Management Santa Teresa/Hale Corridor TOS Infrastructure Improvements Add TOS infrastructure on Santa Teresa Blvd between Day Road and Castro Valley Road. Future ATMS01-10
Arterial Traffic Management Traffic Operations System (TOS) Improvements Enhance expressway traffic operations systems components and functions, and provide connectivity between Santa Clara County and cities for sharing of ITS data/communications. Ongoing ATMS03-10
Arterial Traffic Management Expressway Adaptive Pedestrian Timing Project Adaptive pedestrian timing-dynamic FDW by detecting pedestrians in crosswalks on all expressways. Ongoing ATMS03-10
Traveler Information SCC Motorist Traffic Information and Advisory Systems Motorists traffic information and advisory systems(electronic changeable message signs, advisory radio and web page) Future ATMS06-10
ATIS01-26
ATIS01-25
Arterial Traffic Management Expressway Bike Detection and Santa Teresa Corridor Install bicycle detection on expressway/Santa Teresa shoulders and cross streets as needed at all signalized intersections to support bicycle adaptive signal timing Future ATMS03-10
Arterial Traffic Management Signal Coordination/Interconnect with Cross Streets Signal coordination/interconnect between expressway signals and city/Caltrans signals on cross streets Future ATMS07-10
ATMS03-10

Cupertino

Arterial Traffic Management De Anza Blvd. Advanced Traffic Management System Integrated arterial management system Existing ATMS03-10
Arterial Traffic Management Interchange Improvements-Ramp Meter Signal/Arterial Traffic Signal Interconnection Integrated arterial and freeway management system Existing ATMS03-10
ATMS01-10
Arterial Traffic Management Adaptive Traffic Signal Control System Signal improvement Existing ATMS03-10
Arterial Traffic Management Stevens Creek Blvd CCTV Cameras locations are at the intersections of Stevens Creek Blvd with the SB-85 ramp, Stelling, Blaney, Wolfe, and Tantau. The project includes engineering, and installing communication equipment and cameras. The existing fiber optic infrastructure will be utilized to bring data from the cameras back to the Cupertino Traffic Operations Center. Ongoing ATMS01-10

Daly City

Arterial Traffic Management Traffic Signal System Upgrade Signal upgrade Future ATMS03-10
Arterial Traffic Management Citywide Signal Coordination Signal Coordination Future ATMS03-10
Arterial Traffic Management Communications Master Plan Communication System Upgrade Future N/A

ECCTA

Transit Management Automatic Vehicle Location (AVL) System Automatic vehicle location system Ongoing APTS01-6

Fairfield

Arterial Traffic Management Central Traffic Signal System with wireless communications Central Traffic Signal System with wireless communications Ongoing ATMS03-10

Fairfield/Suisun Transit

Transit Management Intelligent Transportation Systems (Automatic Vehicle Location (AVL), Transit Signal Priority (TSP) for City transit operators) Automatic vehicle location system Existing APTS09-07
Transit Management Automatic Vehicle Location (AVL) System Automatic vehicle location system Future APTS03-5
APTS02-11
APTS01-6
Transit Information Advanced Traveler Information System (ATIS) Traveler information system Future APTS08-11
Transit Management Communications Master Plan Transit management improvement Future N/A

Fremont

Arterial Traffic Management Traffic Management Center (TMC) Traffic management center Existing ATMS03-10
Arterial Traffic Management Communication Master Plan Upgrade all transportation related communications from serial to Ethernet Ongoing N/A
Arterial Traffic Management; Transit Management Special Events Management Transportation Plan Adaptive signal control, transit signal priority, traffic monitoring, traveler information system Future ATMS06-11
ATMS06-10
ATMS03-10
ATMS01-10
APTS09-07

GGBHTD

Transit Management Advanced Communication and Information System Computer Aided Dispatch (CAD)/Automatic Vehicle Location (AVL), RTIS, Transit Signal Priority (TSP), bus telecom system, ATIS, APC, AVM, AVA Ongoing APTS10-2
APTS08-06
APTS06-3
APTS02-05
APTS01-3
APTS09-02
Transit Management Ferry Automatic Fare Collection (AFC) Ferry Fare Management with new faregates and TVMs and data system Future APTS04-14
Transit Management Transit Fare Collection System Bus fare management with farebox and data system upgrade Existing APTS04-05
Transit Information Advanced Traveler Information System (ATIS) Traveler information system Future APTS08-06
Toll Management FasTrak® Electronic Toll Collection (ETC) Toll management system Existing High-Level Diagram

ATMS10-2
ATMS10-1
Transit Management Electronic Fare Collection System Electronic fare collection using the Clipper® card Future High-Level Diagram

APTS04-06

Gilroy

Transit Vehicle Priority Gilroy Community Bus Signal Priority Transit Signal Priority Future APTS02-11
Arterial Traffic Management Adaptive Traffic Signal Control System Signal improvement Ongoing ATMS03-10
Arterial Traffic Management Traffic Signal System Upgrade Upgrade traffic signal controller and communications systems with the current technology, including Interconnect, to replace outdated equipment and provide city with centralized traffic management system. Future ATMS03-10
Parking Management Downtown Parking Management System Electronic parking monitoring system Future ATMS16-3
Infrastructure Security / Surveillance Flood Watch Cameras Deployment of CCTV cameras to provide real-time video to the City of Gilroy Emergency Operations Center to be used to conduct traffic management and emergency operations activities in times of significant flooding. Future EM05-4
Emergency/Event Management Event Management System Develop and deploy CMS, HAR, and information kiosks to provide traveler information system for special events (i.e. the Gilroy Garlic Festival) and incident management in the Gilroy (i.e. flooding in southern part of City). Install 2-CMS on SB US 101, 3-CMS on WB HWY 152 east of Wellington Blvd., City of Gilroy Police station HAR, and a train depot kiosk.  Develop a City of Gilroy traveler information website. Future ATMS08-11
ATMS06-10
ATIS01-26
Arterial Traffic Management 10th St. and Downtown Signals Upgrade Controllers, adaptive, detectors along 10th St. in Gilroy. Future ATMS03-10
Arterial Traffic Management ITS Enhancements on Santa Teresa Blvd Signalization modifications along Santa Teresa Blvd. Future ATMS03-10
Arterial Traffic Management SR 152 Signal System Upgrade SR 152 Signal System Upgrade Future ATMS03-10
Arterial Traffic Management Other Signal Upgrades Other Signal Upgrades Future ATMS03-10

Hayward

Arterial Traffic Management Citywide Emergency Vehicle Preemption Signal Improvement Ongoing EM02-6
EM02-5
EM02-4
Arterial Traffic Management Traffic Signal System Upgrade Signal Upgrade Ongoing ATMS03-10
Arterial Traffic Management Citywide Traffic Signal Coordination Signal Coordination Ongoing ATMS03-10
Arterial Traffic Management Installation of Pedestrian Countdown Timers Signal Improvement Ongoing ATMS03-10
Arterial Traffic Management Traffic Operations System (TOS)/Signal Coordination Signal Improvement Future ATMS03-10
Arterial Traffic Management Adaptive Traffic Signal Program Signal Improvement Future ATMS03-10
Arterial Traffic Management Adaptive Pedestrian Timing Signal Improvement Future ATMS03-10
Arterial Traffic Management Adaptive Bicycle Timing Signal Improvement Future ATMS03-10
Arterial Traffic Management Citywide Transportation Management System Advanced Traffic Management System for the following corridors: Clawiter Road/880 Reliever Route, Hesperian Blvd, Santa Clara St-Harder Road, Huntwood Avenue, Mission Blvd, Foothill Blvd, Second Street, A Street, B Street, D Street-Winton Avenue, Jackson Street, Tennyson Road, Industrial Parkway-Blvd, Whipple Road Future ATMS03-10
ATMS01-10
Arterial Traffic Management Downtown Hayward CBD Traffic and Parking Improvement Project Central Business District traffic management Future ATMS16-3

LAVTA

Transit Management Automatic Passenger Counters (APC) Identifying transit passenger number Existing APTS10-2
Transit AVL/CAD Automatic Vehicle Location (AVL) System Transit Automatic Vehicle Location (AVL) Existing APTS01-3
Transit AVL/CAD LAVTA Computer-Aided Dispatch (CAD) Transit Automatic Vehicle Location (AVL) and Computer Aided Dispatch (CAD) Existing APTS03-2
APTS02-06
Transit Management On-Board Communications Transit vehicle communication system Existing APTS02-06
Transit Information Web-Based Real-Time Transit Information Internet transit information Existing APTS08-07
Transit Management Paratransit Interactive Phone/Web Scheduling Software paratransit management Future APTS03-2
Transit Management Farebox Collection System Transit fare collection Existing APTS04-07
Transit Management Cameras Vehicle Condition, Detectors and Driver Safety Training Transit vehicle surveillance Ongoing APTS05-05
Transit Information Annunciators Transit information annunciators Existing APTS08-07
Transit Information On-Street Dynamic Message Signs Transit info-related on street signs Ongoing APTS08-07
Transit Vehicle Priority Transit Signal Priority (Vehicle to Roadside) Allowing transit vehicles higher priority at intersections Existing APTS09-03
Transit Management Communication Radios Communication dispatch, operators, road sup.'s Existing APTS03-2
APTS02-06
Transit Management Onboard Security Cameras Transit vehicle surveillance. Provide visual coverage of bus (digital storage) Existing/Ongoing APTS05-05
Transit Information Headsigns Provide route and directional information Existing APTS08-07
Transit Management Scheduling Software Allow for fixed route scheduling and mapping Existing APTS02-06
Transit Management Scheduling Software Para Transit scheduling and mapping Existing APTS03-2
Transit Management Web Interface Receive, process and track comments Existing APTS08-07
Transit Management Phone Line Recorder Record and archive CS phone calls Existing AD1-4
Transit Management Dispatch Phone Recorder Record and archive dispatch phone calls Existing AD1-4
Transit Management Farebox Fare collection and passenger count reporting Existing APTS10-2
APTS04-07
Transit Management Engine Monitoring Software Monitor engine conditions and report as needed Existing APTS06-3
Transit Information Website Venue for info., complaints and Web Watch Existing APTS08-07
Transit Information Regional Tripliner Software Assist in 511.org trip planning (regional) Existing APTS08-07
Transit Management Transit Infrastructure Security Cameras Provide visual coverage of building entrances Ongoing APTS05-05
Transit Information On Street Signs Provide real-time bus arrival information (stop) Existing APTS08-07
Transit Management Mobile Data Terminal Communicate driver and mechanical info Existing APTS06-3
APTS03-2
APTS02-06
Transit AVL/CAD In-Vehicle Logic Unit (IVLU) Process (Automatic Passenger Counters (APC) and Automatic Vehicle Location (AVL) data for wireless upload Existing APTS01-3
Transit Security In-Vehicle Security Technologies such as Panic Button Transit security system Existing APTS05-05

Livermore

Transit Management Transit Signal Priority (Vehicle to Roadside) Allowing transit vehicles higher priority at intersections Existing APTS09-07
Arterial Traffic Management Traffic Operations Center TMC Existing ATMS03-10
ATMS01-10
Network Surveillance Web-Based Real-Time Video Information Traffic Surveillance Ongoing ATMS01-10
Arterial Traffic Management Citywide Signal Coordination Signal Coordination Ongoing ATMS03-10

Los Gatos

Arterial Traffic Management Traffic Signal System Upgrade Signal Upgrade Ongoing ATMS03-10
ITS Integration SV-ITS Program network connection to Los Gatos System integration Ongoing ATMS03-10

Menlo Park

Arterial Traffic Management El Camino Real Adaptive Signal Project Signal improvement Existing ATMS03-10
Arterial Traffic Management Willow Rd SR-114, Adaptive Signal Project Signal improvement Future ATMS03-10
Emergency Vehicle Preemption Citywide Emergency Vehicle Preemption Allowing emergency vehicles higher priorities at intersection Ongoing EM02-6
EM02-5
EM02-4
Arterial Traffic Management Traffic Signal System Signal interconnect cable network Existing ATMS03-10

Milpitas

Arterial Traffic Management South Milpitas Blvd SMART Corridor Arterial traffic management coordination Future ATMS03-10
ATMS01-10
Arterial Traffic Management Citywide Adaptive Bicycle and Pedestrian Timing Citywide Adaptive Bicycle and Pedestrian Timing Future ATMS03-10

Morgan Hill

Arterial Traffic Management Citywide Traffic Signal Operation Center Construct traffic signal operation center. Future ATMS03-10
Arterial Traffic Management Citywide Wireless Vehicle Detection System Installation Install wireless vehicle detection system at all signalized intersections within the City. Future ATMS03-10

Mountain View

Arterial Traffic Management Rengstorff Ave Traffic Signal System Improvement Install signal interconnect & upgrade communication. Consider adaptive signal coordination system" Future ATMS03-10
Arterial Traffic Management Shoreline Blvd. Adaptive Traffic Signals Upgrade the existing signal interconnect system to adaptive traffic signals. Future ATMS03-10
Arterial Traffic Management Citywide Traffic Signal Upgrade and IP Traffic Signal Access Upgrade the City's existing traffic signal system through the installation of new traffic signal controllers, software and Internet accessible traffic signal communications. Future ATMS03-10
Arterial Traffic Management Grant Rd. Adaptive Traffic Signal Upgrade the existing traffic signal interconnect system on Grant Rd. to a new adaptive traffic signal system. Future ATMS03-10

MTC

Arterial Traffic Management S/W Data Repository Arterial traffic management Future N/A
Transit Management Clipper® Electronic Fare Collection Regional electronic fare payment system for transit. Existing High-Level Diagram

APTS04-14
APTS04-13
APTS04-12
APTS04-09
APTS04-08
APTS04-06
APTS04-04
APTS04-02
APTS04-01
Traveler Information 511 Traffic Information Regional traffic information via 511 phone number, 511.org, CMS, etc. and includes traffic speeds, incidents, driving times, predicted travel times, parking, etc. Existing High-Level Diagram

ATIS01-02
ATIS01-01
Transit Information 511 Real-time Transit Information Regional real-time transit arrival information via 511 phone, 511.org, dynamic message signs, etc. Existing High-Level Diagram

APTS08-12
Transit Information 511 Regional Trip Planner Regional trip planner that provides multimodal travel itineraries for 511 transit and traffic via 511 phone number, 511.org, my511 and mobile applications. Existing High-Level Diagram

ATIS02-3
ATIS02-2
ATIS02-1
ITS Integration Center-to-Center Network (Smart Corridors - SFgo, East Bay, Silicon Valley, San Mateo) System integration Ongoing High-Level Diagram

ATMS07-08
ATMS07-07
ATMS07-04
ATMS07-03
Toll Management FasTrak® Electronic Toll Collection Regional electronic toll collection system for bridge tolls. Existing High-Level Diagram

ATMS10-2
ATMS10-1
Commercial Vehicle Management Goods Movement Container Reservation System Freight Management Future N/A
Toll Management Regional Express Lane Network HOV-Toll lane Future High-Level Diagram

ATMS10-3
Freeway Traffic Management Freeway Service Patrol Freeway incident identification and fast response/clearance with roving tow trucks. Telecommunications equipment in trucks relays ops data to CHP Computer Assisted Dispatch (CAD). Existing High-Level Diagram

EM04-1
ITS Integration Integrate 511 with Center to Center Integrate 511 with neighbor region 511 systems through C-2-C communication Future High-Level Diagram

ATIS01-03
Parking Management Regional Parking Payment (Clipper/FasTrak®) Enable parking payment at meters and garages with Clipper and/or FasTrak®. Future High-Level Diagram

High-Level Diagram

High-Level Diagram

ATMS16-4
Toll Management Open Road Tolling Open road tolling on Benicia Martinez Bridget using FasTrak® ETC system. Existing High-Level Diagram

ATMS10-5
Toll Management Video Tolling Demonstration Collecting toll based on license plate image. Existing ATMS10-5
Toll Management Advanced Toll Collection and Accounting System (ATCAS 2) Replacement of the toll collection system in lane plaza and central processing enhancement. Future High-Level Diagram

ATMS10-1
Traveler Information 511 Rideshare/Bicycle Information Regional rideshare and bicycling information via 511 phone number and 511.org and includes ridematching and bikemapping tools. Existing High-Level Diagram

ATIS01-03
Arterial Traffic Management; Freeway Traffic Management Transportation Asset Management System Development of transportation asset management system including traffic signal, bus stop, ADA ramp, bike route/path, complete street elements, and any assets within the right of way. Future AD1-9
Parking Management Real Time Parking - Parking Availability on Web, 511 Parking Management System Future High-Level Diagram

ATMS17-2

MTC/Caltrans

Freeway Traffic Management I-880 Integrated Corridor Management (ICM) (I-580/I-80 interchange and SR-237) Integrated freeway and arterial coordination that will include CCTV cameras, Information Display Boards, variable advisory speed signs, ramp metering, trailblazers, vehicle detection, and alternative mode coordination. Future ATMS07-02
ATMS06-12
ATMS04-1
Connected Vehicles Connected Vehicle Testbed Connected vehicle implementation experiments Ongoing ATIS10-1
ATIS09-1
Arterial Traffic Management; Freeway Traffic Management Regional Integrated Corridor Management Strategy Planning and coordination activities to implement ICM on corridors throughout the Bay Area. Future High-Level Diagram

ATMS07-02
ATMS04-1
ATMS03-10

MTC/SAFE

Incident Management Bay Area Call Box Program Provides roadside telecommunication services to motorists in the event of an incident. Existing High-Level Diagram

High-Level Diagram

EM03-1

Napa Valley Transit

Transit AVL/CAD Automatic Vehicle Location (AVL) Automatic Vehicle Location (AVL) Existing APTS01-6
Transit Vehicle Priority Transit Signal Priority (Vehicle to Roadside) Allowing transit vehicles higher priority at intersections Future APTS09-07

Oakland

Arterial Traffic Management Oakland Broadway ITS Project Close Circuit Television (CCTV) cameras, special event management, arterial Changeable Message Sign (CMS), parking guidance Future APTS09-08
Arterial Traffic Management Oakland Transportation Management System Advanced Transportation Management System (ATMS) Ongoing ATMS08-06
ATMS06-05
ATMS03-05
ATMS01-05
Arterial Traffic Management Oakland Airport Intelligent Transportation System (ITS) Project Fiber network, signal coordination, CCTV cameras, traffic responsive plans for Hegenberger and 98th St Ongoing ATMS07-05
ITS Integration Integrated Transportation Network Integrate TMC with EOC, Police Department, Fire Department, and Maintenance Yard Future ATMS08-06
Arterial Traffic Management Oakland North Central Business District (CBD) Project Central Business District traffic management Ongoing ATMS03-05
Arterial Traffic Management Oakland 12th Street Improvements Fiber network, signal coordination, CCTV cameras, for 12th Street (Lake Merritt Area) and integration to existing system Future ATMS03-10
ITS Integration Oakland Video Server Project Video server to manage video feeds, perhaps with public access Future ATMS01-10

Palo Alto

Arterial Traffic Management Citywide Traffic Signal Retiming & Pedestrian Facility Upgrades Signal Upgrade Future ATMS03-10
Arterial Traffic Management Citywide Traffic Signal System Upgrade Replace outdated traffic signal controllers, cabinets and communication chips including installation of time of day GPS system equipment for each signalized intersection. Future ATMS03-10
Emergency Vehicle Preemption Citywide Traffic Signal CCTV/Emergency Vehicle Preemption Project A citywide program to give priority to emergency vehicles via signal timing adjustments. Future EM02-5

Petaluma

Transit Management Paratransit Scheduling & Dispatch Software Schedule optimal paratransit runs, track rider usage, provide a platform for real-time dispatching (via cell phone/smart phones in vehicles) and data reporting. Ongoing APTS03-7

Pleasant Hill

Arterial Traffic Management Contra Costa Boulevard Traffic Management System Arterial traffic management coordination Ongoing ATMS07-10

Pleasanton

Arterial Traffic Management I-580 Smart Corridor Arterial traffic management coordination Existing ATMS07-04
Network Surveillance Video Detection Video detection for traffic/incident/road conditions Existing ATMS01-10
Arterial Traffic Management Traffic Signal System Signal Upgrade Existing ATMS03-10

Redwood City

Arterial Traffic Management Regional Traffic Signalization/Operation Program 2 Traffic Signalization/Operation Program Ongoing ATMS03-10

Rio Vista

Transit AVL/CAD Automatic Vehicle Tracking Automatic Vehicle Location (AVL) Future APTS01-6

SamTrans

Transit Management Automatic Passenger Counter (APC) Expansion Automatically record passenger number Ongoing APTS10-3
Transit AVL/CAD Automatic Vehicle Location (AVL) System Automatic Vehicle Location (AVL) Existing APTS01-5
Transit Management Advanced Communications System Transit Communication Existing APTS03-4
APTS02-10
Transit AVL/CAD Computer Assisted Dispatching (CAD) System Upgrade Computer Assisted Dispatch (CAD) upgrade Existing APTS02-10
APTS03-4
Transit Management Communications System Upgrade Transit Communication Existing APTS03-4
APTS02-10
Transit Management Fare Collection System Replacement Fare collection Existing APTS04-10
Transit Management Electronic Fare Collection System Electronic fare collection using the Clipper® card Existing APTS04-12
Transit Information Predictive Arrivals/Departure System Replacement Predict transit arrival/departure time Existing APTS08-09
Transit Vehicle Priority Adaptive Transit Signal Priority (Vehicle to Roadside) Allowing transit vehicles higher priority at intersections Ongoing APTS09-06
Transit Vehicle Priority Signal Prioritization (Part of VTA Bus Rapid Transit) (vehicle to roadside) Ongoing APTS09-09
Transit Management Manual Pass - Class Counts Fare collection / passenger counting Existing APTS04-10
On-Vehicle Safety System Frontal Collision Warning System Vehicle on-board safety system Existing N/A
Transit Management El Camino Real Bus Rapid Transit (BRT) Coordinated Transit System Future APTS07-5

San Jose

Arterial Traffic Management King Rd/Story Rd. Area Advanced Traffic Management System Provides "real time" traffic management for high traffic congestion location. Existing ATMS07-06
Arterial Traffic Management Monterey Highway Intelligent Transportation System (ITS) A system of signal upgrade, interconnect, and CCTV cameras throughout the Monterey Highway area. Future ATMS03-06
ATMS01-06
Arterial Traffic Management SVITS Connection to Sunnyvale A system of CCTV, Signage and the development of a traffic management center in the City of Sunnyvale Future ATMS07-06
ATMS03-06
ATMS01-06
Network Surveillance Mobile Video Surveillance for Emergency Response video surveillance Future ATMS01-06
Arterial Traffic Management Proactive Signal Retiming Program A citywide program that will monitor current traffic signals and improve them where necessary. Existing/ Ongoing ATMS03-06
Arterial Traffic Management Replacement of Electronic "No Right" at Light Rail Transit (LRT) Crossings Signal Upgrade Existing ATMS03-06
Emergency Vehicle Preemption San Jose Smart Intersection - Traffic Management Center Controls Emergency Vehicle Pre-Emption Traffic Management Center Controls Emergency Vehicle Pre-Emption Existing EM02-6
EM02-5
EM02-4
ATMS03-06
Traveler Information Downtown San Jose CMS Upgrades Upgrades aging changeable message sign infrastructure in Arena area Ongoing ATMS06-06
Incident Management Construction Incident Management - Transportation and Incident Management Center (TIMC) Construct Transportation and Incident Management Center to coordinate incident activities with traffic, fire, and police. Includes control center and integrated communications network. Ongoing ATMS08-07
Parking Management Downtown Parking Guidance System Parking information/guidance Existing ATMS16-1
Incident Management Emergency Vehicle Link System - Traffic Incident Management Center (TIMC) Emergency vehicle communication Future EM02-6
EM02-5
EM02-4
EM01-3
Arterial Traffic Management San Jose Traffic Signal Management Program (signal central) Existing MC07-4
Arterial Traffic Management San Jose Traffic Signal System Upgrades A citywide program that will look at older signal systems and upgrade them where needed. Ongoing ATMS03-06
Arterial Traffic Management Red Light Running Enforcement Program Installation of cameras at various intersections to capture red light runner incidents. Future N/A
ITS Integration San Jose Traffic Signal Interconnect San Jose Transportation Communications Network Enhancements Future N/A
Traveler Information City Hall Traveler Information Center Traveler information collection, processing, and dissemination Ongoing ATIS01-17
Arterial Traffic Management Smart Intersections Arterial traffic management coordination Existing EM02-4
ATMS03-06
Arterial Traffic Management Brokaw-Airport Area Advanced Traffic Management System A system of traffic cameras, and signal system upgrades. Future ATMS03-06
ITS Integration Silicon Valley Smart Corridor Project Phases I, II, and III System upgrade Existing ATMS03-08
Emergency Vehicle Preemption San Jose Emergency Vehicle Preemption System Emergency vehicle preemption system Future EM02-6
EM02-5
EM02-4
Arterial Traffic Management Almaden/Blossom Hill Area Advanced Traffic Management System A system of traffic cameras, signal timing upgrades and other traffic management tools. Future ATMS03-06
Network Surveillance Downtown San Jose Area Freeway Management System An equipment package that will monitor downtown freeways and provide incident management tools to assist with traffic. Future ATMS08-07
ATMS01-06
Arterial Traffic Management Downtown San Jose Local Street Advanced Traffic Management System Expands "real time" traffic management system provided in Arena area. Future ATMS03-06
Arterial Traffic Management Eastridge/Evergreen Area Advanced Traffic Management System A system of traffic cameras, signal timing upgrades and other traffic management tools. Future ATMS03-06
Arterial Traffic Management Saratoga/Moorpark Advanced Traffic Management System A system of traffic cameras, signal system upgrades. Future ATMS03-06
Freeway Traffic Management Silicon Valley TiMC - Ramp Metering Integration Silicon Valley TiMC - Ramp Metering Integration Future ATMS04-03
Arterial Traffic Management SJ Citywide Count and Speed Monitoring System Deploy count and monitoring stations at key locations around the City to provide up to date traffic data for real time traffic management and for investment decisions. Future ATMS19-2
Arterial Traffic Management Winchester /Stevens Creek Area Advanced Traffic Management System A system of traffic cameras, signal timing upgrades and other traffic management tools. Future ATMS03-06

San Leandro

Network Surveillance San Leandro Closed Circuit Television (CCTV) CCTV camera installation Existing ATMS01-10
Arterial Traffic Management San Leandro Signal System and Traffic Management Center (TMC) (Upgrade) Signal Upgrade Existing ATMS03-10
Emergency Vehicle Preemption Emergency Vehicle Preemption EVP Ongoing EM02-6
EM02-5
EM02-4

San Mateo City/County Association of Governments (C/CAG)

Arterial Traffic Management San Mateo C/CAG Roadside Equipment CCTV cameras, trailblazers, transit signal priority, CMS Future ATMS06-11
ATMS06-10
ATMS03-10
ATMS01-10
APTS09-07
Incident Management Incident Management Plan for US 101 Incident Management Plan Existing N/A
Arterial Traffic Management Local Transportation Management Center TMC- San Mateo Hub at Police Station Ongoing ATMS03-10
ATMS01-10
Incident Management Integrated Transportation Incident Management Incident management Ongoing ATMS08-11
Arterial Traffic Management San Mateo County Smart Corridor The project will deploy CCTV cameras, trailblazer signs, and signal upgrades on a portion of US 101 and SR82 corridors and major local streets. Ongoing High-Level Diagram

ATMS08-10a

Santa Clara

Arterial Traffic Management Capitol Expressway TOS Install TOS infrastructure on Capitol Expwy. from SR 87 to I-680 including fiber optic, trunkline, CCTV, Ethernet-capable controller, battery backup system and system detector loops Future ATMS03-10
ATMS01-10
Arterial Traffic Management Santa Clara Traffic Signals Upgrade Citywide traffic signal modifications Ongoing ATMS03-10
Arterial Traffic Management Santa Clara TMC Upgrade Convert City's existing traffic operations room to a new Traffic Management Center. Ongoing ATMS03-10
ATMS01-10
Arterial Traffic Management Santa Clara Communications Network Upgrade Convert City's existing copper twisted wire pair communication infrastructure to new fiber optic cable network. Ongoing N/A
Arterial Traffic Management Citywide Bicycle Detection Install bicycle detection at the stop bar at all of the City's signalized intersections in all approaches. Future ATMS03-10
Emergency Vehicle Preemption Citywide Emergency Vehicle Preemption for Traffic Signals Install GPS based emergency vehicle preemption units for fire and police vehicles to provide preemption of traffic signals. Future EM02-5
Arterial Traffic Management Citywide Pedestrian Signal Upgrades Install Countdown pedestrian signal indications, ADA pedestrian pushbuttons and Audible pedestrian signals at signalized intersections where none exist. Future ATMS03-10
Arterial Traffic Management Citywide Traffic Count and Travel time Monitoring System Install traffic count and travel time monitoring equipment at various locations citywide to provide real-time traffic volumes and travel speed information and integration with City's traffic management system. Future ATMS19-1
Arterial Traffic Management Citywide Traffic Monitoring Cameras Install traffic monitoring and incident management cameras on major arterials. Future ATMS01-10
Arterial Traffic Management Lafayette Street Reversible Lane Control Upgrade Replacement of Reversible Lane Control system, striping and indications along Lafayette Street. Future ATMS18-1
Event Management North Santa Clara Event Management System Installation of ITS elements, DMS, monitoring cameras, communications equipment, and advanced traffic management system throughout northern Santa Clara north of Central Expressway. Future ATMS06-10
ATMS03-10
ATMS01-10
ATMS06-11
Arterial Traffic Management Santa Clara Adaptive Traffic Signal System Install Adaptive Traffic Signal system for major arterials. Future ATMS03-10

Santa Rosa

Arterial Traffic Management Traffic Management Center TMC Ongoing ATMS03-10
ATMS01-10
Arterial Traffic Management Traffic Signal Synchronization Signal improvement Ongoing ATMS03-10
Arterial Traffic Management Adaptive Traffic Signal Controls Signal improvement Ongoing ATMS03-10
Transit AVL/CAD Automatic Vehicle Location (AVL)/GPS Tracking Installing Automatic Vehicle Location (AVL)/GPS MDT's on a fleet of 2 paratransit vans. Current fleet of 11 paratransit buses are already utilizing MDT's Existing APTS01-6

Santa Rosa CityBus

Transit AVL/CAD Automatic Vehicle Location (AVL), Scheduling Software, NextBus Technology, Global Positioning System (GPS) Video System, Transit Signal Priority Transit real time control system Ongoing APTS09-07
APTS08-11
APTS01-6

Saratoga

Arterial Traffic Management Citywide Signal Upgrade Project Phase II Signal Upgrade Future ATMS03-10
Arterial Traffic Management Citywide Accessible Pedestrian Signals Update city-owned signals with audible signals for the visually impaired. Future ATMS03-10

SF Department of Public Works

Traveler Information Trip Planner for Pedestrians with Disabilities Web based trip planner for pedestrians with disabilities. Data includes curb ramps, audible signals and blue zone parking. Future ATIS02-6

SFCTA

Toll Management Areawide Pricing (Planning/Feasibility) Toll management system Future N/A
Transit Vehicle Priority Doyle Drive Value Pricing Transit signal priority and varying toll rates Future APTS09-04

SFMTA

Transit Management Automatic Passenger Counter System Passenger counting system Ongoing APTS10-4
Traveler Information Automatic Vehicle Location (AVL) and Vehicle Arrival Predictions Automatic Vehicle Location (AVL) and Vehicle Arrival Predictions Existing APTS08-13
APTS01-4
Transit AVL/CAD Radio Replacement Communications/Automatic Vehicle Location (AVL)-Global Positioning System (GPS) Radio Voice and Data Communications, Computer-Aided Dispatch, integration with Automatic Vehicle Location (AVL) Future APTS02-08
Transit Management Scheduling/Auto-Dispatch Systems (just fixed route) Ongoing APTS02-07
Arterial Traffic Management Third Street Corridor ITS field devices deployment including transit signal priority for light rail vehicles Ongoing ATMS03-07
APTS09-04
Transit Management Ticket Vending Machine and Subway Fare Gate Replacement Transit fare collection Ongoing APTS04-09
APTS04-08
Transit Management Paratransit Debit Card Transit fare collection Ongoing APTS04-15
Transit Security Subway & Surface Platform Closed Circuit Television (CCTV) Replacement - Station Related ITS field devices deployment Future APTS05-06
ITS Integration Integrated Vehicle & Facilities Maint. System Inventory Control Transit management system Future APTS06-6
Transit Information Digital Voice Annunciation System, Next stop Announcement Transit information system Ongoing APTS08-08
Transit Information Subway Public Address and Platform Display Systems Replacement Transit information system Future APTS08-08
Transit Information Subway Station Talking Signs Transit information system Future APTS08-08
Transit Vehicle Priority Transit Signal Priority Allow MUNI transit vehicles priority at intersections Ongoing APTS09-04
Traveler Information City Services 311 Information System Traveler information system Existing N/A
ITS Integration SFgo - Integrated Transportation Management System Integrated Arterial Management System Existing ATMS06-07
ATMS03-07
ATMS01-07
Parking Management Real Time Parking - Parking Availability on Web, 511 Parking management system Future High-Level Diagram

High-Level Diagram

ATMS17-1
Parking Management On-Street Parking Management – Meters (smart card ready) Parking management system Ongoing High-Level Diagram

High-Level Diagram

High-Level Diagram

ATMS16-2
Parking Management Parking Guidance - Dynamic Message Sign (DMS) Parking management system Ongoing ATMS17-1
Emergency Vehicle Preemption Emergency Vehicle Preemption Allowing emergency vehicles higher priorities at the intersections Ongoing EM02-3
ITS Integration Advanced Train Control System Transit management system Existing APTS02-09
APTS01-4
ITS Integration MTA Transit Management Central Control Facility Expansion/Replacement Transit management center Future APTS05-06
ITS Integration Center-to-Center Network Traffic management center Ongoing High-Level Diagram

ATMS07-07
Transit Management Geary Bus Rapid Transit (BRT) Bus rapid transit on Geary Future APTS09-04
Transit Management Van Ness Bus Rapid Transit (BRT) Bus rapid transit on Van Ness Future APTS09-04

Solano County Transit (SolTrans)

Transit Vehicle Priority Transit Signal Priority (Vehicle to Roadside) Allowing transit vehicles higher priority at intersections Future APTS09-07
Transit AVL/CAD TransTrack Automatic vehicle location system Ongoing APTS01-6
Transit Management Solano County Transit Automatic Vehicle Location System Automatic vehicle location system Ongoing APTS01-6

Sunnyvale

Arterial Traffic Management Closed Circuit Television (CCTV) Camera Deployment Installation of Closed Circuit Television Cameras for traffic monitoring and incident management on the major arterials. Future ATMS01-10
ITS Integration Traffic Management Center (TMC) Integration Implement physical connection to the area-wide data and video information sharing networks to improve the ability to coordinate operations with neighboring transportation management systems. Future High-Level Diagram

ATMS07-10
ATMS06-11
ATMS06-10
ATMS03-10
ATMS01-10
Arterial Traffic Management Traffic Adaptive Signal Controller Update Expand the City's adaptive traffic signal control system to all major arterials. Ongoing ATMS03-10
Arterial Traffic Management Traffic Signal Controller Update Acquire and install new traffic signal controller and cabinets to upgrade City-maintained traffic signals citywide Ongoing ATMS03-10
Arterial Traffic Management Count and Speed Monitoring Stations Deploy count and speed monitoring stations at various locations around the City to provide up-to-date/current statistical information regarding vehicular traffic on arterials. Future ATMS19-1
Arterial Traffic Management Intelligent Transportation System (ITS) Communications Infrastructure Install fiber optic cables to support ITS implementation, communication, video and data sharing within the City and adjoining municipalities. Future N/A
Arterial Traffic Management Sunnyvale Downtown Specific Plan Transportation Improvements Intersection and streetscape enhancements, bikeways, signal improvements, and roadway reconfiguration Future ATMS03-10
Emergency Vehicle Preemption Emergency Preemption Receiver Installation Provide priority and safe passage to emergency vehicles at signalized intersections. Future EM02-5

SV ITS - San Jose Program Manager

ITS Integration San Jose International Airport - Advanced Transportation Management System (ATMS), multiple phases Coordination of multi-mode transportation Existing ATMS08-07
ITS Integration Silicon Valley - ITS Program Upgrades Upgrades infrastructure for existing countywide ITS system Future ATMS03-08
ITS Integration www.511sv.org Traveler information system Existing ATIS01-05
ATIS01-04
ITS Integration Silicon Valley Intelligent Transportation System (ITS) Milpitas/Fremont Project Integrated arterial and freeway management system Existing ATMS07-08
Incident Management Silicon Valley Intelligent Transportation System (ITS) West Project Arterial SMART Corridor Existing ATMS07-08
Arterial Traffic Management Silicon Valley TiMC - San Jose Police Department Integration- San Jose Police Department Integration- Allows for special management of traffic signals for public safety incidents. Future ATMS08-09
ATMS07-08
ATMS01-08
Network Surveillance SVITS Hybrid Analog/Digital Video System A video component of a greater traffic management system. Ongoing ATMS01-08
ITS Integration Wide Area Network Upgrade communication system upgrade Ongoing N/A
Traveler Information Silicon Valley - Intelligent Transportation System (SV-ITS) Traveler Information Website Phase I Traveler information website Existing ATIS01-21

Vacaville

Emergency Vehicle Preemption Traffic Signal Emergency Vehicle Preemption Installation of GPS emergency traffic signal preemption (EVP) devices which also support a transit signal priority system. Antennas will be installed on existing poles. Supporting electronics will be installed inside the traffic control cabinet. Existing EM02-5

Vallejo

Arterial Traffic Management Traffic Signal Interconnect Signal improvement Existing ATMS03-10

Vallejo Transit

Arterial Traffic Management Advanced Traveler Information System Signal improvement Existing APTS08-07

VTA

Transit Vehicle Priority Signal Prioritization (Part of VTA Bus Rapid Transit) (vehicle to roadside) Ongoing APTS09-10
Toll Management US 101 & SR 85 Express Lanes - 880/237 Express Lane Interchange Toll management system Future High-Level Diagram

ATMS10-5
Transit AVL/CAD Automatic Vehicle Location (AVL) and Communication System Upgrade Automatic vehicle location system Future APTS03-6
APTS02-12
APTS01-5
Transit Information Dynamic Passenger Information (DPI) Traveler information system Ongoing APTS08-11
Transit Vehicle Priority Rapid 522 Bus Signal Priority (BSP) Allowing transit vehicles higher priority at intersections Existing APTS09-10
APTS09-09
Freeway Traffic Management Countrywide Ramp Metering Study Integrated arterial and freeway management system Existing N/A
Transit Vehicle Priority El Camino Rapid Transit Project Implement Rapid line 522 improvements in the El Camino Real/The Alameda corridor including: dedicated guideways, signal prioritization, low-floor boarding, ticket vending machines, premium stations, real-time information, and specialized vehicles. Future APTS09-10
APTS09-09
Transit Vehicle Priority King Road Rapid Transit Project A new BRT line from Berryessa BART to Santa Clara Caltrain via King Rd/Alum Rock/Santa Clara/The Alameda/ECR. Takes advantage of existing BRT upgrade for SCAR, but also establishes BRT upgrades along King Road, including signal priority. Implement Rapid Transit on the King Road corridor including: dedicated guideways, signal prioritization, low-floor boarding, ticket vending machines, premium stations, real-time information, and specialized vehicles. Future APTS09-10
APTS09-09
Transit Management Centrally Managed Archive Database Archive real-time feed from the existing applications, including vehicle status data from orbital database and SCADA database, planning data from Trapeze, maintenance data from FIS/SAP, driver assignment data from FIS/BDT. Future AD1-11
Transit Management Develop Communications Architecture The communication architecture will focus on a wide bandwidth communication infrastructure that will meet all transit communication needs and supports an integrated transit ITS system. Future N/A
Transit Management Electronic Fare Collection System Electronic fare collection using the Clipper® card Existing High-Level Diagram

APTS04-13
Transit Management Incident reporting for LRT Develop an incident reporting system for LRT. The LRT incident reporting system should be interfacing with SCADA and incorporate automated report generating features. Future APTS05-10
APTS01-5
Transit Management Intrusion Detection and Warning Intrusion detection and warning system at specific locations of the right of the way for light rail. Prevent conflicts between conflicts between left turn and straight moving vehicles Future APTS05-10
Transit Information Multi-modal Traveler Information A multi-modal traveler information system with options of using a combination of transportation, including cars, parking, or PnR, transit, and walking for encouraging riders to take public transit. Future APTS08-10A
Infrastructure Security / Surveillance Networked Video Surveillance System A networked video security surveillance system for light rail stations and the trains and buses. This project will develop a networked video surveillance infrastructure that includes IP-based video cameras and a video management software system. The video management system includes software tools that manage videos from different sources, perform automatic event detection, and manage data/video. Future APTS05-09
Transit Management Obtain Real-time Fare Data Receive the real-time payment data (and potentially O-D data associated with the payment information) in real-time from the Clipper program Future High-Level Diagram

APTS04-13
Transit Information On-train or On-bus Information Service Combined with broadband service discussed under the WiFi project to offer riders information and entertainment, and the ability to work. Future APTS08-10
Arterial Traffic Management Regional ITS Maintenance Service Operations, Management, and Maintenance for regional ITS equipment Future MC07-6
MC07-4
ITS Integration Regional Transportation Operations Personnel Service (RTOPS) Sharing of dedicated operations personnel – referred to here as “regional coordinators”. The goal of the regional coordinators is to work with involved agency personnel (to the extent each agency desires) to help get the appropriate response to any and all incidents and inefficiencies and to keep the public fully informed at all times. Future N/A
Parking Management Smart Parking Management System Provide drivers with real-time occupancy information of the parking lots at the entrances of the parking lots along highways, through the traveler information website or PDAs. As a critical component of the parking management system, either FasTrak® or RFID based vehicle identification and payment method will be developed. Future High-Level Diagram

ATMS16-4
Transit Information Station Information Service Install LCD monitors with wireless connectivity at light rail stations Future APTS08-10
Transit Management Traffic Surveillance System for Transit Operations Bring in the traffic surveillance videos from selected intersections into the Operations and Control Center (OCC) in order for OCC personnel to determine the level of traffic congestion problems at key spots and to make recommendations to bus drivers to reroute the buses if necessary. Future APTS02-12
Transit Management Updated Light Rail Control System Upgrade the existing SCADA system with a system that supports advanced train control and monitoring functions. Future APTS02-13
Transit Information WiFi for Trains and commuter buses Provide WiFi on individual buses and rail cars using either 3G cellular service or dedicated wireless system Future APTS08-10
Toll Management Silicon Valley Express Lanes Network- SR17 Convert one lane to express lanes from I-280 to SR85 Future High-Level Diagram

ATMS10-4
Toll Management Silicon Valley Express Lanes Network- SR 237 Build new express lanes between Mathilda Ave. and SR 85; Convert existing HOV lanes to express lanes from N. First Street to Mathilda Ave Future High-Level Diagram

ATMS10-4
Toll Management Silicon Valley Express Lanes Network- I-680 Convert/Build express lane from Calaveras Boulevard to Montague Expressway; Convert 1 general purpose lane to express lane between Montague Expressway and US 101 Future High-Level Diagram

ATMS10-4
Toll Management Silicon Valley Express Lanes Network- I-880 Convert existing HOV lanes to express lanes from Alameda County line to US 101; Build express lane between US 101 and I-280. Future High-Level Diagram

ATMS10-4
Toll Management Silicon Valley Express Lanes Network- US 101 Build express lanes from Cochrane Rd. to SR 25. Future High-Level Diagram

ATMS10-4
Toll Management Silicon Valley Express Lanes Network- I-280 Convert existing HOV lanes to express lanes from Leland Ave to Magdalena Ave; Convert 1 general purpose lane to express lane in each direction between US 101 and Leland Ave; Build express lane southbound from El Monte Rd. to Magdalena Ave. Future High-Level Diagram

ATMS10-4
Transit Vehicle Priority Monterey Hwy Rapid Transit Project Rapid Transit Project on Monterey Highway Future APTS09-10
APTS09-09
Transit Vehicle Priority Sunnyvale-Cupertino Rapid Transit Project Rapid transit Project between Sunnyvale and Cupertino Future APTS09-10
APTS09-09
Transit Vehicle Priority Santa Clara/Alum Rock Transit Improvement/BRT Implement Rapid Transit improvements in the Santa Clara/Alum Rock route, including: dedicated guideways, signal prioritization, ticket vending machines, premium stations, real-time information, and specialized vehicles. Future APTS09-10
APTS09-09
Transit Vehicle Priority Stevens Creek Rapid Transit Project Implement Rapid Transit improvements in the Stevens Creek corridor including: dedicated guideways, signal prioritization, low-floor boarding, ticket vending machines, premium BRT stations, real-time information, and specialized vehicles. Future APTS09-10
APTS09-09

VTA/Caltrans

Freeway Traffic Management Countywide Freeway Traffic Operation System and Ramp Metering Improvements Complete planned installation of monitoring cameras, electronic message signs and ramp metering on freeway system. Future ATMS04-1
ATMS01-02

Walnut Creek

Arterial Traffic Management Traffic Signal System Upgrade Signal Upgrade Ongoing ATMS03-10

Water Emergency Transportation Authority

Transit Management Electronic Fare Collection Integration with the regional fare management system (Clipper) Ongoing High-Level Diagram

APTS04-16
Emergency Management Coast Guard Coordination Communications with the Coast Guard sharing ferry location Future APTS05-12
Traveler Information Predictive Ferry Arrival and Departure Information Real-time traveler information Future APTS08-16

WestCAT

Transit Management Automatic Passenger Counters (APC) Automatic passenger counting system Future APTS10-3
Transit AVL/CAD Automatic Vehicle Location Automatic vehicle location system Existing APTS01-6
Transit Management Electronic Farebox/Collection Transit fare collection system Existing High-Level Diagram

APTS04-12
Transit Security Security Updates Transit security monitoring system Future APTS05-08
Transit Information Real-Time Predictive Arrivals/Departures Transit arrival and departure information Ongoing APTS08-15